Feed-water preparation
Share the analysis and existing filters, tanks or dosing equipment so the proposed pretreatment can be coordinated with your site.
BWRO · Capacity selection
Plan treatment for a brackish well, borehole or other analysed feed-water source. The plant configuration is selected around the water report, production schedule and intended use.
Configuration and pricing confirmed in your written quotation.

Production planning
A 20,000 GPD daily requirement is approximately 75,708 litres. To compare proposals, state how many hours the plant can operate and how much water must be available during the busiest period.
Coordinate the production requirement with feed-water supply, treated-water storage and the distribution network. Share expansion plans separately so the proposed current duty and any future allowance are clear.
Provide the well or borehole water report, including the source and any seasonal changes. Pretreatment and membrane selection are reviewed for the actual water, rather than chosen from daily capacity alone.
| Production time | Litres per hour | m³ per hour |
|---|---|---|
| 24 hours/day | 3,155 L/h | 3.15 m³/h |
| 20 hours/day | 3,785 L/h | 3.79 m³/h |
| 16 hours/day | 4,732 L/h | 4.73 m³/h |
| 12 hours/day | 6,309 L/h | 6.31 m³/h |
Volume conversion uses US gallons. These are demand-planning calculations; the proposed equipment rating is assessed for the specified feed water, temperature, operating hours and downtime.
System configuration
Confirm the complete treatment duty and equipment schedule for the 20,000 GPD requirement.
Share the analysis and existing filters, tanks or dosing equipment so the proposed pretreatment can be coordinated with your site.
Ask for the proposed membrane arrangement, pump duty, materials, electrical load and controls in the written equipment schedule.
Include storage, peak draw-off and any finishing stages needed for the intended use. Identify the installation and concentrate-handling scope.
Pump size, membrane count, pressure, recovery, power and final water quality are project-specific. These details are confirmed after reviewing the water and site requirements.
Prepare your enquiry
Add this capacity to your quotation list, then include your quantities, emirate and project notes. You can request other equipment in the same list.
For an existing plant, include the equipment label, operating records and the work you need. See maintenance coverage and service terms for service enquiries.
20,000 US gallons per day is approximately 75,708 litres or 75.71 cubic metres per day. This is a volume conversion. Confirm the proposed plant output at the actual feed-water conditions and operating hours.
Request a written equipment schedule covering pretreatment, membranes, pumps, materials, controls, power, installation and any finishing stages. Daily capacity alone does not specify these components.
Send your feed-water source details and analysis, required daily output, available production hours, intended water use, power supply, site location and storage requirements.
Yes. Compare the daily demand and available production window with the neighbouring capacities linked below. Ask the team to review the required hourly flow and storage before selecting a system.
Share the water report and production requirement with Aqua Best in Dubai, UAE.