Intake and pretreatment
Describe the intake arrangement and provide seawater analysis. Identify the intake works and pretreatment responsibilities in the project scope.
SWRO · Capacity selection
Plan seawater desalination around your intake, water analysis and finished-water requirement. The proposed seawater-rated equipment and operating conditions are confirmed in your quotation.
Configuration and pricing confirmed in your written quotation.

Production planning
A 500,000 GPD daily requirement is approximately 1,892,706 litres. To compare proposals, state how many hours the plant can operate and how much water must be available during the busiest period.
Prepare the demand profile, source-water report and site utility limits together. Include treatment-train arrangement, continuity requirements, storage, concentrate handling, commissioning and acceptance responsibilities in the project brief before comparing complete proposals.
Send a current seawater analysis, intake description and expected temperature or salinity changes. The intake arrangement, pretreatment and materials must be reviewed together for the proposed seawater duty.
| Production time | Litres per hour | m³ per hour |
|---|---|---|
| 24 hours/day | 78,863 L/h | 78.86 m³/h |
| 20 hours/day | 94,635 L/h | 94.64 m³/h |
| 16 hours/day | 118,294 L/h | 118.29 m³/h |
| 12 hours/day | 157,725 L/h | 157.73 m³/h |
Volume conversion uses US gallons. These are demand-planning calculations; the proposed equipment rating is assessed for the specified feed water, temperature, operating hours and downtime.
System configuration
Confirm the complete treatment duty and equipment schedule for the 500,000 GPD requirement.
Describe the intake arrangement and provide seawater analysis. Identify the intake works and pretreatment responsibilities in the project scope.
Request the seawater membrane configuration, pump duty, component materials, electrical load and controls for the specified feed conditions.
State the intended water use, storage and finishing requirements. Include site connections and the agreed concentrate-handling arrangements.
Pump size, membrane count, pressure, recovery, power and final water quality are project-specific. These details are confirmed after reviewing the water and site requirements.
Prepare your enquiry
Add this capacity to your quotation list, then include your quantities, emirate and project notes. You can request other equipment in the same list.
For an existing plant, include the equipment label, operating records and the work you need. See maintenance coverage and service terms for service enquiries.
500,000 US gallons per day is approximately 1,892,706 litres or 1,892.71 cubic metres per day. This is a volume conversion. Confirm the proposed plant output at the actual feed-water conditions and operating hours.
Request a written equipment schedule covering pretreatment, membranes, pumps, materials, controls, power, installation and any finishing stages. Daily capacity alone does not specify these components.
Send your seawater intake details and analysis, required daily output, available production hours, intended water use, power supply, site location and storage requirements.
Yes. Compare the daily demand and available production window with the neighbouring capacities linked below. Ask the team to review the required hourly flow and storage before selecting a system.
Share the water report and production requirement with Aqua Best in Dubai, UAE.